NEW CONCESSIONS BUILDING – V.I.T.

Sealed Bids will be received by the V.I.T. CUSD #2, Table Grove, Fulton County, Illinois for the following: NEW CONCESSIONS BUILDING 1502 East Highway 136, ...

MUSIC RENOVATIONS – V.I.T.

Sealed Bids will be received by the V.I.T. CUSD #2, Table Grove, Fulton County, Illinois for the following: MUSIC RENOVATIONS 1502 East Highway 136, Table ...

PARKING LOT PAVING – V.I.T.

Sealed Bids will be received by the V.I.T. CUSD #2, Table Grove, Fulton County, Illinois for the following: PARKING LOT PAVING 1502 East Highway 136, ...

Adams County Housing Authority Roof Replacement at 222 North Kentucky Street, Camp Point

The Adams County Housing Authority, Clayton, Illinois will receive sealed bids as defined in the Construction Documents for Roof Replacement at 222 North Kentucky Street, ...

MEREDOSIA-CHAMBERSBURG CUSD 11 RESTROOM RENOVATION

Meredosia-Chambersburg Schools is renovating 1 set of boys' and girls' restrooms. 6647 Ad for Bids Addendum No. 1 Bid Tab

REROOF EXISITING BUILDING – NORTH PIKE LIBRARY DISTRICT

Work generally consists of demolition of an existing approximately 4800 sf metal panel roof system and shingle roof system and installation of a new membrane ...

ADDITION TO PAYSON SEYMOUR HIGH SCHOOL

Work generally consists a 2900 sf addition to an existing building comprised of a new kitchen with walk-in cooler/freezer, a new classroom and an entry ...

Mississippi Recreation Center Re-Bid

The work consists of a 57,000 sf athletic facility constructed of a Pre-Engineered Metal Building (PEMB) with metal panel walls and roofs. Interior construction includes ...

Adams County Courthouse HVAC Replacement

THE BID DATE IS BEING EXTENDED TO THURSDAY, 2/27/25, AT 2:00 PM. THIS WILL BE OFFICIALLY LISTED IN ADDENDUM #2 AT A LATER DATE. Work ...

Adams County Courthouse Roof Replacement

THE BID DATE IS BEING EXTENDED TO THURSDAY, 2/27/25, AT 2:00 PM. THIS WILL BE OFFICIALLY LISTED IN ADDENDUM #2 AT A LATER DATE. Work ...

SCIENCE LABS RENOVATIONS – JWCC

Work consists of remodeling 6300 square feet of existing lab, classroom space and restroom space for new science labs and restrooms.  The scope of work ...