FILESIZE: 14 MB

Base Bid M-1: Abandon existing geothermal well field and install 2 high efficiency boilers and 1 cooling tower. Piping modifications above ceilings and in existing rooms as required. Refer to drawings for additional information.

Advertisement for Bids

Addendum No. 1

Addendum No. 2

THIS ADDENDUM DOES NOT CHANGE THE BID DATE.