Work generally consists a 2900 sf addition to an existing building comprised of a new kitchen with walk-in cooler/freezer, a new classroom and an entry vestibule. Demolition and minor modifications to the existing building are part of the project. The new building will be constructed of concrete foundations, steel structure, CMU walls with brick veneer, and a new membrane roof. New roof top HVAC units are being installed also. The new kitchen will have new equipment installed. Plastic laminate casework will be installed in the classroom. The site work includes demolition, new asphalt and concrete paving, and new utility connections. The base bid includes all work shown on the drawings. Alternate bid A-1 is a deductive alternate bid to omit the classroom and entry vestibule portions of the work.