In 2016, Architechnics’ engineers were selected to provide design services for the Trane Corporation as part of a performance based contract and Health Life Safety Upgrade. This contract included the replacement of the entire mechanical equipment in the middle school. New water source heat pumps, high-efficiency natural gas boilers, evaporator cooling tower, energy recovery unit ventilators, electric terminal heating equipment and chemical treatment system replaced the original HVAC systems.