In 2014, Architechnics’ engineers were selected to provide design services for the Trane Corporation as part of a performance based contract. This contract included the replacement of the entire mechanical systems in the grade school and high school. New hybrid type water source heat pumps, high-efficiency natural gas boilers and evaporator cooling towers replaced the original hot water heating systems including new pumps, piping, chemical water treatment and temperature control systems.