John Wood Community College is expanding the Truck Driver Training Facility. This project adds a new shifting range and turnaround lane to the site.
Click below to download the current project documents:
If you have problems try right clicking and choose Save Target As...
PLAN HOLDERS LIST (Updated Daily)
ADDENDUM 1
ADDENDUM 2
BID RESULTS
NO PRE-BID MEETING WILL BE HELD
BIDS DUE
3:00 PM Prevailing Time
Thursday, February 2, 2012
John Wood Community College
Office of the President
1301 S 48th Street
Quincy, IL 62301
BASE BID “A” - Architect's Estimate $130,000.00
GENERAL CONSTRUCTION WORK: SITE PREPARATION WORK -
NEW SHIFTING RANGE DEVELOPMENT
Including all related work shown on the Drawings and Specifications
pertaining to Grading, Excavation, Backfill, Roadway Base, Drainage Work,
and Site Lighting Electrical Work. Provide labor and material, equipment,
etc. required to complete all work delineated for this Bid Category in these documents.
ALTERNATE BID “A-1”
NEW TURNAROUND LANE
Including all related work shown on the Drawings and Specifications
pertaining to the construction of the turnaround lane. Provide labor
and material, equipment, etc. required to complete all work delineated
for this Bid Category in these documents.
ALTERNATE BID “A-2”
NEW LIGHTS FOR EXISTING LIGHT STANDARDS
Including all related work shown on the Drawings and Specifications
pertaining to providing new light heads for two (2) existing exterior
light fixtures. Provide labor and material, equipment, etc. required
to complete all work delineated for this Bid Category in these documents.